05310-MAU SUMMER SPL Train Schedule
Anand Vihar Terminal(ANVT)Mau Jn (MAU)
Train Schedule:
STATION NAME | CODE | ARRIVAL | HALT | DEPARTURE | DAYS | DISTANCE |
---|---|---|---|---|---|---|
Anand Vihar Terminal | ANVT | First | 0 min | 12.30 | 1 | 0 |
Ghaziabad | GZB | 13.30 | 2 min | 13.32 | 1 | 13 |
Moradabad | MB | 14.45 | 5 min | 14.50 | 1 | 154 |
Bareilly | BE | 16.40 | 5 min | 16.45 | 1 | 245 |
Sitapur Jn | STP | 19.45 | 5 min | 19.50 | 1 | 407 |
Burhwal Jn | BUW | 21.20 | 2 min | 21.22 | 1 | 505 |
Gonda Jn | GD | 22.15 | 2 min | 22.17 | 1 | 565 |
Mankapur Jn | MUR | 22.40 | 2 min | 22.42 | 1 | 594 |
Basti | BST | 23.30 | 2 min | 23.32 | 1 | 655 |
Khalilabad | KLD | 23.55 | 2 min | 23.57 | 1 | 685 |
Gorakhpur | GKP | 00.30 | 10 min | 00.40 | 2 | 719 |
Deoria Sadar | DEOS | 01.40 | 2 min | 01.42 | 2 | 769 |
Bhatni Jn | BTT | 02.00 | 2 min | 02.02 | 2 | 790 |
Belthara Road | BLTR | 02.55 | 2 min | 02.57 | 2 | 822 |
Mau Jn | MAU | 04.00 | 0 min | Last | 2 | 857 |
Train 05310 MAU SUMMER SPL runs from Anand Vihar Terminal to Mau Jn onMonday.
MAU SUMMER SPL departs from Anand Vihar Terminal at 12.30 and reaches to Mau Jn at 04.00 . It takes 00 Hours 00 Minutes to reach from Anand Vihar Terminal to Mau Jn. The total distance covered by MAU SUMMER SPL is 857 kilometers.
MAU SUMMER SPL passes through 15 stations in 2 days to reach from Anand Vihar Terminal to Mau Jn.
05310 MAU SUMMER SPL has a maximum halt time of 10 minutes at Gorakhpur . 05310 MAU SUMMER SPL arrives at Gorakhpur on 00.30 and departs at 00.40 . You can get down at Gorakhpur to buy some snacks and refreshments.
Other stations with maximum halt timings are:
Moradabad | 5 Minutes |
Bareilly | 5 Minutes |
Sitapur Jn | 5 Minutes |
Gorakhpur | 10 Minutes |
Food Options in 05310 MAU SUMMER SPL
Enjoy a scrumptious assortment of Veg Thali, Non-Veg Thali, Jain Food, Chinese and local delicacies during your journey. Passengers in train can prefer the below-mentioned food delivery in train apps for getting fresh restaurant-style food in train.- RailRestro App
- RailMitra App
- IRCTC food ordering app
Frequently Asked Questions
. 05310 MAU SUMMER SPL starts from Anand Vihar Terminal
. What is the time taken by MAU SUMMER SPL to reach from Anand Vihar Terminal to Mau Jn ?. 05310 MAU SUMMER SPL takes 00 Hours 00 Minutes approx to reach from Anand Vihar Terminal to Mau Jn.
. What is the maximum halt time and at which station ?. Maximum halt time of MAU SUMMER SPL train is 10 minutes at Gorakhpur .
. What is the train schedule of MAU SUMMER SPL ?. MAU SUMMER SPL departs from Anand Vihar Terminal at 12.30 and reaches at Mau Jn by 04.00.